Difference between revisions of "IFAD synthesis project: Base Documents"

From KM4Dev Wiki
Jump to: navigation, search
(Created page with "The IFAD synthesis project is summarizing and reflecting on a series of project outputs listed here. ===Project overview=== The International Fund for Agricultural Developme...")
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
{{Template:Navbar-IFAD-funded-synthesis}}
 
The IFAD synthesis project is summarizing and reflecting on a series of project outputs listed here.
 
The IFAD synthesis project is summarizing and reflecting on a series of project outputs listed here.
 
===Project overview===
 
 
The International Fund for Agricultural Development (IFAD) funded three major pieces of work in 2011 -
2013:
 
* '''SNA''': a Social Network Analysis of the network (and of its
 counterparts in French and Spanish, SA-GE and SIWA)
 
* '''CTLab''': a technology stewardship-focused initiative
 
* '''L&M''': a set of 'Learning & Monitoring' activities to review operations and processes within the network as well as the activities 
and results of the IFAD-funded KM4Dev activities.


 
 
The IFAD synthesis project is to
 synthesise the results of the three completed tasks above and to provide a proper
 analysis of insights and recommendations to KM4Dev as to how it could
 further develop See [http://bit.ly/1bN1FxV KM4Dev project 2012 Plan of Activities ]
 
 
: '''Output''': A report on common
 findings from the above studies on activities or aspects of KM4Dev that are seen to be going well; those which make it stand-out as a groundbreaking and influential network; and those that need improvement. The report should identify major issues and develop recommendations for future action, including suggestions on ways to strengthen positive aspects of KM4Dev and resolve identified issues. These will be discussed with 
representatives of the three project groups and the KM4Dev core group.
 
  
 
===SNA===
 
===SNA===
* http://wiki.km4dev.org/AAR_SNA (contains several outcomes and recommendations
+
* http://wiki.km4dev.org/AAR_SNA (contains the actual reports, at the bottom of the page)
 
* http://www.km4dev.org/profiles/blogs/the-purpose-of-the-km4dev-sna
 
* http://www.km4dev.org/profiles/blogs/the-purpose-of-the-km4dev-sna
 
* http://www.km4dev.org/profile/GrahamDurantLaw  
 
* http://www.km4dev.org/profile/GrahamDurantLaw  
Line 21: Line 11:
 
* http://wiki.km4dev.org/CTLab:Tech_Inventory  
 
* http://wiki.km4dev.org/CTLab:Tech_Inventory  
 
* http://wiki.km4dev.org/CTLab:Review  
 
* http://wiki.km4dev.org/CTLab:Review  
 +
* http://wiki.km4dev.org/AAR_CT_Lab
 
* http://wiki.km4dev.org/Technology_Stewardship
 
* http://wiki.km4dev.org/Technology_Stewardship
 +
* Two proposals surfaced after the synthesis report was finished, a [https://docs.google.com/document/d/1B4uOaOrkIOZ7bQiCcSaZvejgzcvOndfGy8Z0hvvQMqM/edit KM4Dev Technology Stewards Draft TOR] and a [https://docs.google.com/document/d/13XV159iYWo-HJGhRBhzI0QiT0PMFXJtzQpgQrhsL_-w/edit Draft ToR for TSG Launch Consultant]
  
 
===L&M===
 
===L&M===
 
* http://wiki.km4dev.org/Documenting_the_L%26M_work  
 
* http://wiki.km4dev.org/Documenting_the_L%26M_work  
* http://wiki.km4dev.org/KM4Dev_Learning_and_Monitoring_2012-2013 **
+
* http://wiki.km4dev.org/KM4Dev_Learning_and_Monitoring_2012-2013 (the final report is here:  [[File:KM4Dev_Learning_and_Monitoring_final_baseline_report.pdf]])
 
* http://wiki.km4dev.org/L%26M_group_discussion_on_finalising_the_report
 
* http://wiki.km4dev.org/L%26M_group_discussion_on_finalising_the_report
 
[http://wiki.km4dev.org/John_David_Smith John David Smith] is taking the lead on this project which will be active in September and October of 2013.
 

Latest revision as of 19:48, 27 November 2013


The IFAD synthesis project is summarizing and reflecting on a series of project outputs listed here.

SNA

CTLab

L&M